A. A developer proposing a temporary use of land or building which would otherwise require an approval under provisions of this chapter is required to obtain a temporary use permit prior to any site work, except that temporary buildings associated with the construction of an approved use do not require a permit (i.e., tool shed, etc.). The manager may issue an approval under the same procedures as for a land use permit pursuant to HBC 18.40.030 and 18.60.020(H). No building or use requiring a variance shall be permitted under this section.

B. Within five days of the expiration of a temporary use permit, all buildings and other materials associated with the temporary use shall be removed from the site and the site restored to the condition it was in prior to the development of the temporary use.